Building Code

Modern design just isn’t what it used to be.

Contemporary DesignOne word many people use to describe the overall feel of their ideal design is “modern,” especially when the design is meant to update an older space. What they typically mean is they want the style and characteristics of their new space to be current and recent. They want something contemporary. “Modern” is a funny word when used as an identifier of style. Historically speaking, modern describes the span of time around the years 1500 to 1800. But kitchen and bathroom fixtures from that time period haven’t yet come back into vogue, and their electrical and lighting designs really wouldn’t meet current building codes.

In the design world, modern describes a specific style movement that was considered “contemporary” from the 1920s through the 1950s. Carefully selected elements from the modern era, as well as those from various other design periods, are often brought together cohesively by present-day designers.

By those same design world definitions, contemporary describes the time period between the 1980s and now, whenever “now” happens to be. If represented on a timeline, it’s typically preferred that contemporary design sits a little closer to the now side than the one bookended by Reagan’s move into the White House. Technically speaking, unless there is a mass shift by the design community at large to either go back in time or far ahead into our estimated future, contemporary design, by its very definition, will be “modern” as long as there is a now for which it to refer.

It’s all complicated stuff.

Luckily, the DM+A team keeps itself up to date on current and emerging trends in architecture and design. We study and research current popular designs, and we know what’s needed in order for those designs to meet strict building codes. We’re watching the trendsetters, but our work is accessible enough to set trends of our own. We know hip and with it and chic and sophisticated and cool. In short, DM+A knows contemporary.

But we also know modern.

Why You Need a Design Professional Before Signing a Commercial Lease in San Francisco

Essential Tips: Steps to take before leasing a commercial space that needs to be remodeled.

Your small business loan just came through, your business needs to expand into its own space, and you are excited to sign the lease and start the remodeling…STOP right there…it would be wise to consider doing the following steps:

  • Is the existing building use correct for your needs?

This might seem like a weird question, but the space which you wish to lease may currently have the use of a warehouse and you are hoping to use it as a large office space.  If the code treats these types of spaces differently, then you will be required get a Change of Use permit.  You are not guaranteed this, so this should be a consideration before signing a lease.  You will need to confirm with the City Planning office to see what the current building use is.

  • Do a walk through with the Landlord and an architect.

Determine if anything needs to be repaired or replaced.  If so, have it all completed before you move in. If there is a tenant improvement allowance as a part of the lease, have an architect assist you to determine if the allowance is enough.  If the landlord will not repair something and you do not intend on fixing it, then take photos to document the existing conditions, so you won’t have to pay for it once you leave.

  • Will your aesthetic needs and expectations be met?

Consult a designer to see if the space can meet your aesthetic end goals. You may really like this bright and open space when you are visiting a listing and want to keep it that way, but the problem is that your program requirement is all private offices and this once open space will be closed up.

  • Was the current space completed with legal permits?

If you plan on doing any work, confirm that any previous work was completed with a building permit.  This may seem like something that is a given, but many people do remodeling without permits to save money.  This will unfortunately cost you more with the addition of adding headaches to the mix.  If you are doing a remodel job and go for permit, the city must have record of the existing conditions.  So if the tenant before you did some illegal work and you plan on retaining that work you’ll have to add it to your plans as new.  This way the city can approve it and it be deemed legal.

Sounds not that bad, huh? Well when you pay your permitting fees or try for unreasonable hardship, they are calculated by the estimated construction cost.  This means, that even if you didn’t actually complete the non-permitted work, you’ll have to include it in the overall construction costs, which will increase your fees or possibly limit the chance to get the hardship approved.

Also what if the work completed was not up to building code?  Well you can imagine the problems could become really big, if say only (1) toilet room was built when (2) are required by code. Would you know this when you walk the space?  Ask the landlord for a copy of the approved drawings.  This will let you walk the space to see if anything was added illegally.  Or go to the building department records to see what is on file and approved.  If you aren’t able to do any of these, then at a minimum protect yourself and add a clause in your leasing contract.  Add a clause which allows you to break the lease should any issues arise from illegal remodeling or have the landlord responsible to remedy the space to be legal and code compliant.

  • Does the exiting work with your intended use & occupancy?

An architect can do quick calculations and analysis to determine what your final occupant load will roughly be, which will tell you how many exits are required.  This gets particularly questionable, when you only have (1) exit to the public way such as the front entrance.  This will limit how many occupants you are allowed to have, which may not be enough to meet your business’s needs.

  • Will your existing furniture & program work?

You should always get a test fit of your program into the proposed space.  It might meet your square footage needs, but are they where you need them?  Furniture needs clearance and you probably want it to be laid out in a comfortable way.  A designer can quickly assess the proposed area and compare with your expectations.

If you're in the Bay Area, please contact us for a free consultation and a walk-through of the potential space.

The DM+A Team